This Old House Season 45 Episode 11
Lexington: Electrical Bond
Returning Series
27 min
7.9/10 Votes: 1079
Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.